Design and construction of the tunnel under the Avet ski trail
Project name: Design and construction of the tunnel under the Avet ski trail Promoter: ENSISA Year: 2009 Location: Andorra Description: Design and construction of the tunnel under the Avet ski trail to solve a junction with the main blue track of Soldeu (Grandvalira) Length: 80 m Average gradient: 12%
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed