SEMSA elaborates preliminary and executive projects for cable transportation installations, selecting the best paths, the balance with ski tracks and other infrastructures, the available technology that best fits with the specific conditions and the best service/cost ratio.
Our participation in the design and construction of ropeways may be done at different levels: global project management, elaboration of technical documents, construction site management, obtaining administrative authorizations and even specific punctually advice advice.
During lift operation, we oversee the technical supervision and improvement of the lifts and we can define adaptations to the new regulation, management and commercial needs.
Ropeways is the niche where we can demostrate our technical experience guaranteed by the numerous installations we have studied.
Some of our realizations:
“Mexicable” urban gondola. Mexico
Line assembly works. Soldeu detacahable chairlift. Grandvalira – Andorra
Foundations construction by helicopter
“C” detachable chairlift at Konakli, Turkey
Muntatge de línia. Telecadira “El Tarter”, Grandvalira
Station assembly. Coma Blanca detachable chairlift, Grandvalira – Andorra
“Mexicable” urban gondola. Mexico
Estany chairlift civil works, Porte des Neiges, France
Estany detachable chairlift, Porte des Neiges – France
El Tarter gondola, Grandvalira – Andorra
On site foundation supervision
Vertical evacuation
Aquesta web utilitza cookies per a obtenir dades estadístiques de la navegació dels usuaris. Si continues navegant considerem que n’acceptes l’ús. Més informació